You build. Minitku writes.
For site teams.
Get the minutes after the meeting.Put your phone on the table. Get the minutes after the meeting, even when you mix Bahasa Melayu, English and 中文.
MySTI certified by MOSTI“Okay Faizal, wet riser tu test by Wednesday, 可以吗?”
Site Meeting No. 12
Tue, 25 Nov
Summary
Wet riser at Block A to be tested by Wednesday. Mr. Tan sends the test report on Friday. The Level 3 defect to be closed on Thursday.
Task Assignment
The record behind the signature.
Pick a stage of the project. See what Minitku keeps.
Work starts
Site meetings begin
Minitku keepsMinutes from the very first meeting.
- AR
- FZ
- TK
- ML
- SN
- JL
- RK
- HM
- Work programmeFaizal · 11 Mar
- Site office and hoardingSite team · 7 Mar
- Drawing registerArchitect · 11 Mar
8 present · 3 actions, each with a name
Groundwork
Forms G1 to G3
Minitku keepsEach inspection: what was checked, and who fixes it.
- P7 outside tolerance · Faizal · 18 Apr
- 2 piles re-checked and closed
24 piles checked · 1 item open
Building and services
Forms G4 to G21
Minitku keepsOpen actions carry into the next meeting.
1 action carried · 2 new
Agency inspections
Letters for the G forms
Minitku keepsEach agency visit: items raised, fixes, re-inspection.
- Hose reel pressure, Level 3
- Exit sign, staircase 2
- Fire door, Level 1
3 items raised · 2 closed
Completion
Form F
Minitku keepsThe dated records, for the signer’s own file.
The PSP signs. Minitku does not.
After handover
Defects Liability Period
Minitku keepsWhat was agreed, and what was fixed.
- 3-05 ceiling crack · Faizal · 21 Jul
- 3-02, 3-08 fixed and closed
8 units walked · 3 defects, 2 closed
Minitku does not fill in, sign or submit Form F or Forms G1 to G21. The Principal Submitting Person certifies.
Said on site. Not lost on site.
- InstructionMove the riser opening to grid C/4.Architect to issue a written instruction · 28 Nov
- VariationTwo more floor traps at Level 5.QS to price · 1 Dec
- DelayRevised Level 5 drawing came 3 days late.Faizal to give written notice · 26 Nov
Without the word listArchitect to reply to our FYI 23 by Friday.
With the word listArchitect to reply to RFI 23 by Friday.
RFI Request for information
Without the word listQS to price video 7 for the extra floor traps.
With the word listQS to price VO 7 for the extra floor traps.
VO Variation order
Without the word listContractor to submit the E or T claim this week.
With the word listContractor to submit the EOT claim this week.
EOT Extension of time
Without the word listTarget date for triple see is the end of March.
With the word listTarget date for CCC is the end of March.
CCC Certificate of Completion and Compliance
Without the word listThe bomber re-inspection is on 19 Feb.
With the word listThe Bomba re-inspection is on 19 Feb.
Bomba Fire and Rescue Department
Without the word listI double UK to inspect the sewer connection.
With the word listIWK to inspect the sewer connection.
IWK Indah Water Konsortium
Without the word listclassic assessment booked for Block A.
With the word listQLASSIC assessment booked for Block A.
QLASSIC CIDB’s quality assessment
Without the word listdosh to inspect the lifts before handover.
With the word listDOSH to inspect the lifts before handover.
DOSH Department of Occupational Safety and Health
ItemFire door at Level 1 does not self-close.
- 9 FebRaisedBomba inspection
- 12 FebFixedFaizal
- 19 FebClosedRe-inspection
- On fileFor the signerFire-fighting (G8, G9)
Questions site teams ask.
Does Minitku fill in Form G or Form F?
No. The Principal Submitting Person signs Form F. The contractor, the site supervisor and the professional sign each Form G. Minitku keeps the dated record behind each signature.
Does it work with no signal on site?
Recording works offline. Writing up the minutes needs an internet connection, and you can wait until you’re back in the office.
Bring it to your next site meeting.
Free for 3 hours of meetings, every month.